Qingdao Deerma Plastic Machinery Co., Ltd,
|
Gold Index: 6831
Place of Origin: | Guangdong, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
PET Bottle Automatic Plastic Recycling Machine , 300KG/H
Our PET Bottle Waste Plastic Recycling Machine is widly used for PET bottle crushing, washing recycling and drying with highly automatic system.After being washed, dewatered recycled and dried, it will get clean PET flakes and the water content will be very low( <1%),which can be used to make granules directly or some other use
Process line of PET Bottle washing recycling machines
Belt conveyer → Rolling separator →Manual pick table → Metal separator → Belt conveyer → Crusher →
Label Separator → Hot washer 1 → Friction washing machine → Hot washer 2 → High speed friction
washing machine → Rinsing tank → Spray washing→ Dewatering machine → Blower dryness system →
Storage hopper → Finished product packing
Main Composition & Install Power of PET Recycle Line
Item | Name | Specification | Quantity |
---|---|---|---|
1 | Belt conveyor | 1.1kw | 1 pc. |
2 | Label separater machine | 15kw | 1 pc. |
3 | Manu sorting table | 1.1kw | 1 pc. |
4 | Belt conveyer | 1.1 kw | 1 pc. |
5 | PC600 Crusher | 22kw | 1 pc. |
6 | Screw loader | 2.2kw | 1 pc. |
7 | Hot washer | 4kw | 1 pc. |
8 | Screw loader | 2.2 kw | 1 pc. |
9 | Friction washer | 5.5kw | 1 pc. |
10 | Rinsing washer | 3kw | 1 pc. |
11 | Rinsing washer | 3kw | 1 pc. |
12 | Centrifugal dewaterer | 4 kw | 1 pc. |
13 | Pipeline dryer | 2.2 kw | 1 pc. |
14 | Storage bunker | 1 m3 | 1 pc. |
Quality Assurance (Deerma)
1. Quality Management System Certification
Certification | Certified By | Certificate No. | Business Scope Expiry Dat | Expiry Date |
ISO 9001:2008 | Beijing Hangxie Certification |
| Design and Production of |
|
2. Product Certification
Certification | Certified By | Certificate No. | Business Scope Expiry Dat | Expiry Date |
CE | European | CN.CE.0680-10/10 | Plastic Extrusion Machinery & | 29/Oct./2010 -- |
3. Quality Control Management
Is there quality control on all production lines? | Yes, all production lines have adequate quality |
Do the QA/QC inspectors work independently from the production line? | Yes |
Who does the QC/QA Manager/Supervisor report to? | GM -- Mr. Yanzhong Li |
How many QA/QC inspectors in total? | 4 |
Number. of Employees in Each Production Line | Supervisor 1 |
4. Supplier Management
Does the company have a supplier assessment procedure? | Yes |
Does the company have an updated list of approved suppliers? | Yes |
Does the company establish and implement a standard procedure for purchasing contract review and approval? | Yes, with written standard procedures |
Does the company keep its supplier assessment reports? | Yes, assessment reports are available for the last 1-3 years |
Are the company’s purchasing documents sufficient to ensure product safety control and their customers’ requirements? | Yes, the purchasing document includes all the |
Is there a procedure to conduct random product inspections after final packaging? | Yes, with clear standard and written inspection records |
5. After Sales Service
Is customer feedback, including complaints, clearly recorded and | Yes, with a standard feedback form and records |
Are there any clear procedures for handling customer complaints? | Yes, with clear procedures and written records |
Is there a closed-loop corrective action system in place? | Yes |
Can finished/packaged products be traced by lot identification to the | Yes, with procedures to trace raw materials |
Is there a product alert and recall procedure? | No |
Installation and testing work
After the machines are delivered to customer’s workshop, we will send our engineer to client's factory after preparation work is completed;
Our engineer will be responsible for the installation and machines testing; also technicians will give free training lessons to labors in customer’s factory.
Clients need to afford visa formalities, airplane tickets (round-way), residency, meals and allowance of USD60 per day for our engineer.
Guarantee period and after-sales services: 12months since B/L date. During this guarantee period, we will provide spare parts without any charge. If the malfunctions are caused by your incorrect operations, we provide the buyer spare parts at cost price.
Qingdao Deerma Plastic Machinery Co., Ltd, [China (Mainland)]
Business Type:Manufacturer
City: Qingdao
Province/State: Shandong
Country/Region: China (Mainland)